Risk register template

Free risk register template for security and compliance teams

An Excel risk register with automatic 4x4 scoring, owners, treatment decisions and framework references for SOC 2, ISO 27001, HIPAA and NIST CSF. Three worked examples included. No signup.

What is in the template

  • Risk Register sheet: 19 columns, from the risk description and owner through to the approver for accepted risks.
  • Automatic scoring: enter impact and likelihood from 1 to 4 and the score and color-coded severity fill in.
  • Dropdowns for category, treatment (mitigate, accept, transfer, avoid) and status, so the register stays consistent.
  • Scoring Guide sheet describing each impact and likelihood level in plain business terms.
  • Three worked examples: ransomware and backups, an admin account without MFA, and a vendor breach.

How to fill in a risk register

  1. Describe the risk as event, cause and impact. "A phished admin account takes over Microsoft 365 because MFA is not enforced for admins" is a risk. "Phishing" is a category.
  2. Give every risk one owner. The owner is accountable for the decision, not necessarily the person doing the fix.
  3. Score it with the guide. Agree the scoring definitions before you start, or every person will score differently.
  4. Decide the treatment. Mitigate, accept, transfer (for example through insurance) or avoid. Accepting a risk is a valid decision, but it needs an approver and a review date.
  5. Link the controls. List what already reduces the risk and which framework requirements those controls satisfy. That is what turns a list into audit evidence.
  6. Review on a schedule. Quarterly at minimum, plus after incidents, audits and major changes.

When a spreadsheet stops being enough

A spreadsheet works for a first pass. It struggles once several people edit it, once risks need to connect to controls and evidence, or once leadership wants a current view instead of last quarter's file. That is the point where teams move to risk register software. Radius360 keeps the same 4x4 model, maps each risk to SOC 2, ISO 27001, HIPAA and NIST CSF controls, and opens mitigation tasks for critical and high risks. If you also need policies, see our free security policy templates.

Frequently asked

What is a risk register?+

A list of the risks that could hurt your organization, with an owner, a score and a decision for each one. For security programs it is the record auditors, boards and insurers look at to see that risks are known, ranked and being handled.

What columns should a risk register have?+

At minimum: a risk ID, a description, an owner, impact and likelihood scores, the overall score, the treatment decision, the controls in place, the planned action with its owner and due date, a status and the last review date. This template has all of them, plus framework references and an approver column for accepted risks.

How is the risk score calculated?+

Impact (1 to 4) multiplied by likelihood (1 to 4), giving a score from 1 to 16. The template colors it automatically: 12 to 16 is Critical, 8 to 11 High, 4 to 7 Medium and 1 to 3 Low. The Scoring Guide sheet describes what each impact and likelihood level means so different people score the same way.

Does this work for SOC 2 and ISO 27001?+

Yes. Both expect a documented risk assessment with owners and treatment decisions. Use the framework references column to show which controls address each risk, for example SOC 2 CC3.2 or ISO 27001 clause 6.1.2 and Annex A controls.

How often should we update it?+

Review it at least quarterly, and whenever something material changes: a new system, a vendor, an incident or an audit finding. Accepted risks should carry a review date so the acceptance does not quietly become permanent.

Is it really free?+

Yes. No signup is needed to download it. If you outgrow the spreadsheet, Radius360 can import it from CSV.

Ready to move the register off the spreadsheet?

Radius360 scores risks, maps them to controls and creates mitigation tasks for you. Import this template from CSV and keep going.